Year | Title |
---|---|
2008 | A generic environment for modeling future launch operations—GEM-FLO: a success story in generic modeling.
Journal of the Operational Research Society.
1312-1320.
|
2007 | A Heuristic Algorithm for The Just-In-Time Single Machine Scheduling Problem With Setups: A Comparison With A Simulated Annealing.
The International Journal of Advanced Manufacturing Technology.
326-335.
|
2006 | Scheduling Setups Changes at Bottleneck Facilities in Semiconductor Manufacturing.
Production Planning and Control Journal.
717-727.
|
2004 | A Branch-and-Bound Algorithm for the Early/Tardy Machine Scheduling Problem with a Common Due-Date and Sequence-Dependent Setup Time.
Computers & Operations Research Journal.
1727-1751.
|
Year | Title |
---|---|
2002 | A Simulated Annealing Algorithm for a Scheduling Problem with Setup Times
|
2002 | Generic Simulation Models of Reusable Launch Vehicles.
747-753.
|
2002 | Modeling the Space Shuttle.
754-762.
|
2001 | Dispatching Rule to Schedule Setup Changes at Bottleneck Facilities in Semiconductor Fabs.
233-240.
|
2001 | Macro-Level Simulation Model of Space Shuttle Processing.
143-148.
|
2000 | Simulation Modeling and Analysis of Space Shuttle Flight Hardware Processing.
59-62.
|